Above: The north-south wing of the third floor, formerly home to the Biology Department. Demolition is the first step in creating new laboratory space, including a new Soil & Plant Tissue Testing Laboratory.
Below: Exterior view of the north-south wing. The loading dock has been removed which will allow for utilities housing for the new construction. Additionally, a modern elevator will be installed in the entrance of the current Soil Testing Lab, at the north end of the ground floor.